Two Hundred - The Beach, Toronto, Kanada

  • Gebäudeart:
  • Wohngebäude
  • Geschäftsgebäude
Vollbild Schließen Street View

This seven storey condo project incorporates DELTABEAM®, hollow core slabs and wide flange steel columns. Through the use of DELTABEAM®, the project has a slim floor across all levels. Multiple cantilevers were also introduced through the use of our specialized beam: in some configurations continuous DELTABEAM® helped with the design of balconies, while in other cases added steel on the side of DELTABEAM® facilitated each slab’s edge design.

Projektdaten

Nutzfläche:
71 200 ft2
Geschosse:
7
Projektentwickler:
The Riedel Group
Bauunternehmen:
LCL builds
Tragwerksplanung:
Atkins + Van Groll Inc.
Architektur:
Richard Ziegler Architect Inc.
Fertigteilwerk:
The Prestressed Group (PSI)
Lieferzeitraum:
2017
Fertigstellung:
2018

Kontakt

Dominic Lemieux, P.Eng.

Dominic Lemieux, P.Eng.

Managing Director

Tel. (888) 734-5561 ext.500
Mob. 418-808-8007
[email protected]