Lidl Distribution Centre, Oosterhout, Netherlands

  • Gebäudeart:
  • Lager & Logistik
  • Geschäftsgebäude
Vollbild Schließen

Around 400 concrete columns with a height of almost 20 metres were quickly, easily, safely erected without the need of temporary bracing thanks to Peikko's column connections. By using Peikko's system, the construction company saved a lot time, manpower and costs.

Projektdaten

Nutzfläche:
54,000 m2
Lieferzeitraum:
2017
Fertigstellung:
2018