Daesan Biomass Power Plant Cooling Tower, Seosan, Südkorea

  • Gebäudeart:
  • Energieversorgung
Vollbild Schließen

Peikko's first major project in Korea.

 

CGN Company Ltd develops a new biomass power plant in Seosan, about 120 km south from Seoul. Biomass turbine driven compressors with shaft power of 110MW.

Peikko delivered Bolted connections to all the precast in the project's cooling tower building. Peikko's HPKM®/PEC® Column Shoes and HPM®/COPRA® Anchor Bolts were used in the project.

With Peikko systems erection of columns is faster and easier than conventional methods.

 

Projektdaten

Projektentwickler:
CGN DAESAN POWER Co., Ltd.
Bauunternehmen:
HYUNDAI ENGINEERING & CONSTRUCTION
Tragwerksplanung:
BORU, INHUS
Fertigteilwerk:
TAEHWA Engineering Co., Ltd.
Lieferzeitraum:
2019
Fertigstellung:
2021

Kontakt