Business Garden Warszawa, Stage 2, Warszawa, Polen

  • Gebäudeart:
  • Bürogebäude
Vollbild Schließen Street View

Five buildings were built in the second stage of the investment. 

The buildings were designed in a mixed structure: the underground part as a monolithic structure, and the above-ground part in a prefabricated structure.

In total, over 1960 m of DELTABEAM® beams and hidden PCs® Corbels were built into the project. The buildings meet the highest LEED certification standards.

Mehr lesen down-arrow.png

Projektdaten

Nutzfläche:
102,000 m2
Geschosse:
2+7
Projektentwickler:
Vastint Poland
Bauunternehmen:
Hochtief Polska
Tragwerksplanung:
Arcade Polska
Architektur:
JSK Architekci
Fertigteilwerk:
Ergon Poland
Lieferzeitraum:
2014
Fertigstellung:
2017

Kontakt